- Product Categories
- Friendly Links
Information Name: | * License of Special Equipment |
Published: | 2014-05-14 |
Validity: | 30 |
Specifications: | Certification Advisory |
Quantity: | 9999999999.00 |
Price Description: | |
Detailed Product Description: | Boiler and pressure vessel manufacturing license conditions in accordance with the requirements of Chapter I of the first "Boiler and Pressure Vessel Manufacturing Supervision and Administration" (hereinafter referred to as the "management approach") and the relevant provisions of the formulation of the condition. Article conditions apply "management approach" set forth in the boiler and pressure vessel manufacturing enterprises (hereinafter referred to as enterprises). Article III of the conditions of the boiler and pressure vessel manufacturing license conditions require resources, quality management system requirements, product safety and quality requirements of boilers and pressure vessels of three parts. Resource conditions require basic conditions and special conditions, including the former General requirements for all levels of the manufacturing of boiler and pressure vessel products, which are manufactured special requirements of the relevant levels of boiler and pressure vessel products, companies should also meet the basic conditions and the corresponding special conditions. Article enterprises must establish and manufacturing of boiler and pressure vessel products suited to the quality management system and to ensure continuous and effective operation. Enterprises should continue to manufacture boiler and pressure vessel performance, to verify the ability to control boiler and pressure vessel quality management system. NDT Article enterprises, heat treatment and physical and chemical properties of the inspection work, commitment by the companies, but also has signed a subcontracting agreement with the appropriate qualifications or capacity of enterprises, subcontracting agreements should be issuing agency record. The commissioned work was commissioned by the report issued by the appropriate corporate quality control work commissioned by the commissioning party is responsible, and included in the business of boiler and pressure vessel quality assurance system control. Special conditions require the contents have not subcontract. Article enterprises must have the ability to independently complete the main boiler and pressure vessel manufacture products may not be all the pressure parts of boiler and pressure vessel products are subcontracting. |
Admin>>>
You are the 6762 visitor
Copyright © GuangDong ICP No. 10089450, Nanjing Jie Fei Enterprise Management Consulting Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 6762 visitor
Copyright © GuangDong ICP No. 10089450, Nanjing Jie Fei Enterprise Management Consulting Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility